What is a Permitting?
The process of obtaining official government approvals and permits required to develop, construct, and operate outdoor hospitality properties, including building permits, environmental permits, and operational licenses.
Understanding Permitting
The permitting process typically includes several types of permits:
**Building Permits:** Required for constructing structures, including glamping units, RV pads, restroom facilities, clubhouses, and other buildings. Building permits ensure structures meet safety codes, building standards, and accessibility requirements.
**Environmental Permits:** May be required for:
- Water and wastewater systems
- Stormwater management
- Wetland impacts
- Protected species considerations
- Air quality (if using generators or wood stoves)
**Health Department Permits:** Required for:
- Food service (if operating a restaurant or cafe)
- Swimming pools and hot tubs
- Restroom and shower facilities
- Waste disposal systems
**Fire Department Permits:** Required for:
- Fire safety systems
- Emergency access roads
- Fire suppression equipment
- Open burning (fire pits)
**Operational Permits:** Business licenses, occupancy permits, and operational approvals that allow the property to open and accept guests.
The permitting timeline can vary significantly:
- Simple projects: 2-4 months
- Complex projects: 6-18 months or longer
- Projects requiring environmental review: 12-24 months
Permitting costs also vary widely:
- Basic building permits: $5K-$15K
- Environmental permits: $10K-$50K+
- Complex projects with multiple permits: $50K-$200K+
Common permitting challenges for outdoor hospitality properties include:
- Multiple agency coordination (local, state, federal)
- Environmental regulations (especially for rural/natural settings)
- Access and road requirements
- Utility connections and infrastructure
- Setback and density requirements
- Historical or cultural resource protections
The permitting process is often a critical path item that can delay project timelines and impact costs. Delays in permit approval can push back construction start dates, affect financing timelines, and delay revenue generation.
Sage Outdoor Advisory includes permitting analysis in our feasibility studies, helping clients understand permit requirements, timelines, and costs. We identify potential permitting obstacles early in the development process and provide guidance on navigating the approval process efficiently.
Examples of Permitting
- •A glamping resort developer must obtain 12 different permits: building permits for 25 glamping units ($8K), septic system permits for wastewater ($15K), well permits for water supply ($5K), fire department approval for fire pits and emergency access ($3K), health department permits for restroom facilities ($2K), environmental permits for wetland impacts ($25K), and business operational permits ($2K). Total permitting costs: $60K, with a timeline of 8-10 months. The feasibility study identifies this as a critical path item requiring early start.
- •An RV park expansion project requires permits for 50 new sites, including building permits for RV pads and utilities ($12K), environmental permits for stormwater management ($18K), and health department approval for additional restroom facilities ($4K). The permitting process takes 6 months, but delays in environmental review push the timeline to 9 months, delaying construction start and affecting projected revenue by 3 months of lost income.
- •A campground developer discovers that their property requires a special use permit in addition to standard building permits because it's located in a protected watershed area. The special permit process requires additional environmental studies ($30K), public hearings, and extended review (12 months). This discovery during feasibility analysis allows the developer to factor in additional time and costs before proceeding with the project.
Common Use Cases
- •Planning development timelines and budgets
- •Understanding regulatory requirements before property purchase
- •Securing necessary approvals for construction and operation
- •Managing project schedules and critical path items
Related Services
Frequently Asked Questions About Permitting
What permits are required for outdoor hospitality properties?
Permit requirements vary by location and project type, but typically include building permits, environmental permits (water/wastewater, stormwater), health department permits (restrooms, food service), fire department permits (safety systems, access), and operational/business permits. A feasibility study should identify all required permits for your specific project.
How long does the permitting process take?
Permitting timelines vary significantly: simple projects may take 2-4 months, while complex projects with environmental review can take 12-24 months. Factors affecting timeline include project complexity, agency workload, environmental requirements, and public hearing schedules. Permitting is often a critical path item that can delay project timelines.
How much do permits cost for outdoor hospitality projects?
Permit costs vary widely based on project scope and location. Basic building permits may cost $5K-$15K, while complex projects with multiple environmental permits can cost $50K-$200K+. Costs include application fees, plan review fees, inspection fees, and sometimes required studies or environmental assessments. A feasibility study should estimate permit costs for your specific project.
What happens if permits are denied?
Permit denials can delay or prevent projects. You may be able to appeal, modify plans to address concerns, or seek alternative solutions. However, permit denials can significantly impact project viability. This is why feasibility studies should evaluate permit feasibility and identify potential obstacles before significant investment.